Browse Source

colocation indent

refactoring
Nico Schottelius 3 years ago
parent
commit
bacc16bb9c
  1. 8
      content/u/products/colocation/contents.lr

8
content/u/products/colocation/contents.lr

@ -36,7 +36,7 @@ average 4m² surrounding area). This way we don't need to actively cool.
If you want to bring your own hardware, you can select from the
following options:
## Space
### Space
For one server we provide you with 1m² of physical shelf space. We
call this our "base unit".
@ -45,12 +45,12 @@ Your server can be 1U, 2U or even 4U high. Contact us for special sizes.
We expect your server to not create more warmth than 3000 BTU/h. If it
produces more heat, you will need to add more base units.
## Electricity
### Electricity
Your electricity usage is monitored and charged monthly. The price for
electricity is 0.2 CHF/kWh.
## Connectivity
### Connectivity
We offer 3 levels of connectivity:
@ -64,7 +64,7 @@ Bandwidth exceeding the booked tarif is charged at 2.5 CHF/Mbps.
You get a multi mode fiber cable (850nm transceivers) to your shelf.
## IP addresses
### IP addresses
* Colocation includes a /48 IPv6 network for free
* IPv4 addresses are provided using NAT64 for 9 CHF/IPv4 address/month

Loading…
Cancel
Save