change size

Signed-off-by: Nico Schottelius <nico@kr.ethz.ch>
This commit is contained in:
Nico Schottelius 2011-09-14 01:43:07 +02:00
parent 34befa5fff
commit 0d9e4249be

View file

@ -42,7 +42,7 @@ Deploying to one host took 72 seconds, to three hosts 77 seconds,
to 6 hosts 108 seconds and to 31 hosts 282 seconds, as can be seen to 6 hosts 108 seconds and to 31 hosts 282 seconds, as can be seen
in the following graph: in the following graph:
[[!img cdist-2.0.0-rc4-graph.png size="400x300" alt="Cdist graph"]] [[!img cdist-2.0.0-rc4-graph.png size="600x450" alt="Cdist graph"]]
In a sequential run, it would have taken 2232 seconds to deploy In a sequential run, it would have taken 2232 seconds to deploy
to 31 hosts. At higher parallel configurations (>10), it can be seen to 31 hosts. At higher parallel configurations (>10), it can be seen